The second stage works inside the design team's project without replacing its criteria. Documentation is developed, changes are incorporated and shared information is kept coherent.
The abbreviated terms (AP / PB / PBE / PR) are explained in each sheet: they are project stages in Spain, not a promise of universal scope.
The second stage works inside the design team's project without replacing its criteria. Documentation is developed, changes are incorporated and shared information is kept coherent. The abbreviated terms (AP / PB / PBE / PR) are explained in each sheet: they are project stages in Spain, not a promise of universal scope.