Construction

Technical reports

Purpose

Order facts, observations and technical questions.

Quick answers

What

Gathering of background, analysis of the information available and drafting with an explicit object and limits.

When

When facts and observations need to be ordered and the conclusions kept within bounds.

How

We define the object and the sources, analyse what is available and draft with clear limits.

Why

A report with a defined object and limits can be defended and avoids conclusions that do not hold.

Who is it for

Teams that need an ordered, bounded technical document.

Scope

Deliverables

Procedure

  1. Scope

    We agree the object, the sources available and the limits of the report.

  2. Production

    We gather the background, analyse the information and structure the content.

  3. Check and delivery

    We check consistency and deliver the report with sources, observations and bounded conclusions.

Rates

See rates

Tools

BIM · CDE

Frequently asked questions

How is this service priced?

By the object and the volume of sources. The scope is set in the commission and the figure comes from the current rate, or as a fixed price.

What does a report not include?

Whatever falls outside the agreed object and sources. The limits are stated in the report so that conclusions are not drawn beyond what holds.

Related services

Act

Tell me about your project ↗